Assembly instructions – GAMMA 6900 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 4B - February 2014) User Manual
Page 6

7
Transportation Screw
The machine has been shipped with a motor
and load cell protection screw. Remove the
screw before using the machine. Retain the
screw for future shipment. Install the included
rubber grommet into the hole.
Remove this Screw
Height Adjustment
The height of the machine is adjustable
from 39” to 46” in approximate 1” incre-
ments. To change the height, remove the
socket head cap screw from its current po-
sition and place it in the appropriate hole
to set the desired height of the machine.
Be sure to thread the screw completely
into the upper column so the head of the
cap screw rests in the notch of the lower
column that is parallel to the string reel
holder.
Stand Upper Post Installation
With the height adjustment cap screw on
the upper column facing the string reel
holder, align the four holes in the upper
column fl ange with the threaded holes in
the machine base. Lift the machine base
and insert the upper post into the lower
column until the head of the cap screw
rests in the notch of the lower column and
tighten the locking knob.
ASSEMBLY INSTRUCTIONS
- 6900 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 5A - February 2014) 6900 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 2 - August 2010) 6900 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 1 - April 2010) 8800 Els STRINGING MACHINE 2 POINT SC MOUNTING (Issue 2 - January 2009) 6900 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 1 - April 2010)