beautypg.com

Fronius String Control 250/30 DCD DF User Manual

Page 72

background image

70

Connecting data communication cables to the Froni-

us String Control 250/30 DCD DF

Linking options

The Fronius String Control 250/30 DCD DF can be linked into the Fronius Solar Net in 2
ways:
-

using pre-assembled data communication cables with RJ45 plug connectors
Cable recommendation:
cable type CAT 5, 1:1 cable

-

using multi-core data communication cables.
Max. cable cross-section 2.5 mm²

RJ45 connection sockets

Spring terminals for connecting multi-core data com-
munication cables

Additional insula-
tion for data com-
munication
cables

IMPORTANT! To provide additional insulation for the data communication cables, a piece
of silicone tube is supplied as standard with the Fronius String Control 250/30 DCD DF.
When data communication cables are run inside the Fronius String Control 250/30 DCD
DF, the cables must be enclosed by the silicone tube.

NOTE! After successfully mounting use a cable tie to secure the silicone hose at
the contact protection.

This manual is related to the following products: