Installation, Commissioning – Flowserve UNA 14 User Manual
Page 16
16
Installation
– continued –
Hand vent valve UNA 14, UNA 16, UNA 16 A, UNA 14 P (optional extra)
1. Remove plug G or, if installed, hand vent valve J.
2. Insert gasket H and mount hand vent valve F. Use a torque of 75 Nm.
3. Close hand vent valve.
Manual float-lifting lever UNA 14, UNA 16, UNA 16 A (optional extra), UNA 14 P
1. Remove plug G.
2. Insert gasket H and mount floating lifting lever J. In doing so insert the lever extension and
keep it upright. Use a torque of 75 Nm.
Tools
■
Spanner A. F. 17, DIN 3113, Form B
■
Torque spanner 20-120 Nm, DIN ISO 6789
Tools
■
Spanner A. F. 17, DIN 3113, Form B
■
Torque spanner 20-120 Nm, DIN ISO 6789
Note
Standard covers are not provided with holes. Retroffiting is therefore not possible.
Note
Standard covers are not provided with holes. Retrofitting is therefore not possible.
Standard equipment for UNA 14 P
Make sure that the hand vent valve and the float-lifting lever are firmly attached to the UNA 14, UNA
16, UNA 16 A and UNA 14 P and tight.
Commissioning