MX/DDC-100 Field Unit Installation and Maintenance FCD LMENIM2329-01 – 03/11
64
Contractor Tasks
Deliverable
From
To
Comments
Specifications
Engineer
Contractor
Complete P&IDs for site
Schedule
Engineer
Contractor
Time line complete w/milestones
Project
Responsibilities
Engineer
Contractor
Define which supplier is responsible for each portion of project
P&ID
Engineer
Contractor
Detailed layout and instructions for building site. Information should include
actuator tag names, required data points from actuator, field unit, and field wiring
Site Electrical
and electronics
Engineer
Contractor
Detail site electrical requirements, cable type, layout, and locations. Voltages
available for equipment
Loop Drawings
Engineer
Contractor
Detail cable routings from Host to each field device. This defines how the network
cable is to run throughout the facility
Schedule
Contractor
Limitorque
Provide material delivery dates for hardware. Schedule Flowserve Limitorque
Controls Service Technician for actuator commissioning (when requested
according to purchase order)
Hardware
Limitorque,
OEM
Contractor
Provide Motor-Operated Valves, RS-232/485 converters (if supplied), valves,
mounting adapters, etc.
Manuals
Limitorque
Contractor
Product Bulletins for Actuators:
• LMAIM4019 Direct-to-Host Programming Guide
• LMAIM1329 Accutronix Installation and Operation for MX-DDC Field Unit
• LMAIM4029 DDC-100 UEC Field Unit (Modbus) Installation and Operation
Manual
• LMAIM4030 DDC-100 UEC Field Unit Installation and Commissioning Manual
• LMAIM4022 DDC-100 UEC Field Unit Wiring and Startup Guidelines
• Modicon Modbus Protocol Reference Guide PI-MODBUS-300 Rev. G (available
from Modicon)
Operational
System
S.I.
Contractor
Develop and test programming for DCS system
Documents
S.I.
Contractor
Documentation of program operational characteristics, equipment used, and
Operation and Maintenance Manuals for equipment
Schedule
Contractor
S.I.
Provide delivery dates for commissioning control system. Include dates for testing,
documentation, and turnover to site personnel
Hardware
for system
development
Contractor
S.I.
Hardware may include: DDC-100 Field Units, RS-232/485 converters
Actuator
Contractor
S.I.
Availability of DDC-100 Field Unit for testing developed application software
Site Preparation Contractor
S.I.
Complete actuator or field unit installation. Provide actual (as installed)
Site Preparation Contractor
Limitorque
Install specified equipment, cables for power and network communication. Verify
all network and power cables are properly routed, terminated, and documented
prior to commissioning of DDC-100 Network. The contractor should provide
detail on network routing from Host system to each field unit. Verify all field units
are properly grounded
Field Unit
Startup
Limitorque
Contractor
According to purchase order requirements, when scheduled