beautypg.com

Maintenance – Flowserve PA46 User Manual

Page 21

background image

Maintenance

 continued 

Replacing stuffing box, valve seat and valve plug MPA 46, MPA 47

. Detach pressure line for the control fluid of the diaphragm actuator from the screwed socket

Z.

. Remove diaphragm actuator

Y. Fig. 4

3. Remove spacer disk

X and pressure plate V.

4. Unscrew hexagonhead cap screws

W.

5. Remove pressure plate

V and mounting bracket B.

6. Pull out split pin

S.

7. Use openend spanner A. F. 8 mm to unscrew the pressure pin

R from the valve plug D.

8. Remove compression spring

P.

9. Use openend spanner A. F. 3 mm to unscrew the union nut

O.

0. Unscrew sealing plug

G and remove gasket F.

. Pull out valve plug

D.

. Take out internal parts

N M L K L J of stuffing box.

3. Use steel punch to knock the valve seat

H out of the valve body I. Fig. 7

4. Clean stuffing box, valve body and valve plug.
5. Insert new valve seat

H such that two opposite holes are in the flow direction of the intermittent

valve.

6. Use punch made of CuZn to fix the valve seat in the valve body.

Fig. 8

7. Insert valve plug

D and apply abrasive paste type TETRABOR

®

F400 for polish grinding.

8. Insert new gasket

F and screw in sealing plug G. Tighten with a torque of 350 Nm.

9. Reinsert internal parts of stuffing box according to order as specified on page 4.

Fig. 5, Fig. 6

0. Apply heatresistance lubricant to stuffing box thread (use e. g. WINIX

®

50).

. Align valve plug

D such that the hole for the split pin S is perpendicular to the flow direction of the

intermittent valve.

. Use openend spanner A. F. 3 mm to screw in union nut

O and tighten at room temperature with

a torque of

55 Nm.

3. Apply heatresistant lubricant to both sides of the compression spring

P (use e.g. WINIX

®

50) and

place it onto the union nut

O.

4. Use openend spanner A. F. 8 mm to screw the pressure pin

R onto the valve plug D until the

holes for the split pin

S in the valve plug and the pressure pin overlap.

5. Insert split pin

S.

6. Reinsert mounting bracket

B and pressure plate V.

7. Insert hexagonhead cap screws

W and tighten them in diagonally opposite pairs with a torque

of

20 Nm.

8. Put spacer disk

X onto pressure plate V.

9. Screw on diaphragm actuator

Y with a torque of 120 Nm.

30. Attach pressure line for the control fluid of the diaphragm actuator.
3. Operate the valve once.

WINIX

®

50 is a registered trademark of WINIX GmbH, Norderstedt

TETRABOR

®

is a registered trademark of WackerChemie GmbH, Kempten

This manual is related to the following products: