Operation – Flowserve HV 205 User Manual
Page 32

32
– continued –
Emergency Operation
- continued -
If both bottom valves are to be closed via emergency operation, first close the bottom
valve for the liquid phase and then the one for the gas phase.
Drawing see page 4
1.
To close the bottom valve
unscrew the sealing-off screw for emergency
unloading
out of the bottom of the actuating cylinder
. The spring in the bottom
valve
effects the closing.
2.
Once the emergency loading/unloading process has been accomplished, screw the
sealing-off screws
back into the rear wall of the operating device
.
3.
To finish the loading/unloading process close the shut-off valves
and attach the
sealing plugs to the shut-off valves
.
4.
Defective bottom valves
must be permanently marked in order to avoid
inadvertent re-commissioning.
Do not screw sealing plugs
into defective bottom valves
.
5.
The cause of the malfunction must be ascertained and eliminated by qualified
personnel!
A
Y
D
A
Y
B
E
E
A
V
A
Warning
In case of emergency operation a rapid-action closing of the bottom valve
is not possible.
When the emergency operation of one or both bottom valves is finished,
find and eliminate the cause for the malfunction. Note that the repeated or
continuous application of the emergency operation is considered as
improper usage. The resulting risk will have to be borne by the user alone.
The manufacturer hereby expressly rejects any claims for any resulting
damage.