Operation – Flowserve HV 205 User Manual
Page 29

29
Operation
Operation
During the loading process the following actions will take place:
Opening of bottom valve
Closing of bottom valve
To open / close the bottom valves
operate one of the operating devices
at either side
of the tank.
Drawing see page 4
If necessary remove custom's lead seal from the bolt
when opening the operating
device
.
1.
To open the operating device
push the bolt
upwards and then turn it by 90° to
one side. You can now swing down the lid.
2.
Make sure that the pump lever
of the hydraulic pump
is completely extended to
the front.
3.
Connect the rail hook
(e. g. rail hook type VZ 10) to the tension rope
and
engage it in the rail. Pull the tension rope
tightly such that the ball valve of the
control unit
is closed and the hydraulic system is ready for operation.
4.
The up-strokes and down-strokes of the lever
of the hydraulic hand pump
in the
operating device
built up pressure in the hydraulic system, resulting in the
simultaneous opening of both bottom valves
. After approx. six strokes of the pump
lever
both bottom valves
will be completely open. Check position of bottom
valves: The opening position of the bottom valves
is indicated by the two indicating
pistons
of the indicating cylinders
which must be completely moved out (lift of
indicating pistons approx. 46mm).
5.
Open the lateral shut-off valves
to start the loading/unloading process.
6.
The pump lever
of the hydraulic pump
is no longer required and must be
returned to its original position.
A
B
M
B
B
M
J
T
I
F
F
C
J
T
B
A
J
A
A
O
K
E
J
T
Attention
If only one operating device for the loading system was opened, the lid of
the other operating device cannot be opened when the bottom valves are
open.