beautypg.com

Flowserve Circulator User Manual

Page 9

background image

9

Option 3

The level switch kit includes:

• Level switch, 3/4” NPT

Kit Installation Instructions

1. Apply Teflon tape and/or Jomar pipe dope or equal

to level switch threads. Start no closer to the end of the

threads than the 2nd thread.

2. Clean any dirt or debris from the reservoir connection.

Remove 3/4” plug from reservoir coupling next to the

level gauge.

3. Thread in level switch. Tighten with flats on the shaft in

the vertical position. See figure 3.

4. Installation is complete.

5. It is the responsibility of the customer to wire the level

switch.

Option 4

The heat exchanger kit includes:

• Heat exchanger

• Heat exchanger mounting brackets

• U-bolts with nuts and mounting pad (quantity 2)

• Tube fittings (quantity 3)

• Tubing (quantity 3)

Kit Installation Instructions

1. Apply Teflon tape and/or Jomar pipe dope or equal to

the 4 tube fittings threads. Start no closer to the end of

the threads than the 2nd thread.

2. Remove tubing from the manifold block to the filter

and discard.

3. Attach heat exchanger mounting brackets with two (2)

1/2” 13 mounting bolts through the holes provided in

the top of the manifold block and finger tighten bolts.

See Figure 4.

4. Place a mounting pad on each mounting bracket

between the mounting holes.

5. Place the heat exchanger on the mounting pads. Shell

connection should be facing up with the cooling media

connections facing the drain side of the reservoir. See

Figures 4 and 5.

6. Install the U-bolts over the heat exchanger and

through the mounting pads and brackets and finger

tighten nuts.

7. Install and tighten tube fittings into the heat exchanger

shell connections. Do not over tighten.

8. While facing the unit from the block side, position the

heat exchanger approximately 4-1/2 inches (114 mm)

from the right side of the reservoir. See Figure 4.

9. Level the heat exchanger across the cooling media

ports. See figure 5.

10. Remove the fitting nuts and ferrules from the fittings

on the left side of the heat exchanger and the mani-

fold block. Assemble the short piece of tubing, 90°

union tube fitting and the short 90° bent tube into the

heat exchanger and the manifold block.

11. Verify tubing ends are the correct length. Cut to fit if

required. Proceed to the next step once tubing is the

correct length.

Figure 3

Seal Support System

Part No.

Part No.

PSI

to
to

Xxxxxxx

Xxxxxxx Xxxxx Xxxx Xx

Xxxxx xx xxxxxxxxx

Xxxxx xx xxxxxxxxxxx

Xxxxxx

Xxxx Xx.

Xxxx xxxxxx xxxx

xxxxxxxx xx xxxx

xxxxxx xxxxxxxxx

xxxxxx xxxxxxxxx

xxxxx

level switch

shaft position