5 commissioning, start-up, operation and, Shutdown, 1 pre-commissioning procedure – Flowserve WMV IDP User Manual
Page 14: 2 direction of rotation, 3 guarding, 4 priming and auxiliary supplies, 5 starting the pump, 6 running the pump, Commissioning and operation (5), Direction of rotation (5.2)
