OPERATION AND
MAINTENANCE

Pre-start Check
• Check that supply voltage matches
nameplate data.
• Ensure that the unit is properly
grounded.
• With power off, check blower wheel
set screw for tightness and ensure
that the blower wheel rotates freely
and quietly.

Check that the water coil, valves

and piping have been leak checked
and insulated as required.

Ensure that all air has been vented

from the hot water coil.

NOTE: It may require purging several
gallons of water so have a means of
discarding the water.

Install all panels.

NOTE: The blower door must be in
place for the unit to operate due to the
door safety switch.

Install any filters which may have

been removed during the installation
process.

****** WARNING ******

• Always wear eye protection.
• When fan coil is operating,
some components are operating
at high speeds. Personal injury
can result from touching these
items with any object
• All electrical and service
access panels must be returned
and secured in their proper
place.
• Clear surrounding area of all
tools, equipment and debris.
• Check the entire unit to
ensure it's cleanliness.

****** WARNING ******

The manufacturer does NOT
WARRANT equipment sub-
jected to abuse. Metal chips,
dust, drywall tape, paint over
spray, etc. can void warranties
and liability for equipment
failure, personal injury and
property damage.

****** WARNING ******

To prevent pump damage,
the fan coil unit should not be
energized for heating until the
hot water coil and all water
lines have been purged of air.

Figure 1

****** WARNING ******

Hot water can cause scalding.
A hot water mixing valve can
be applied to the system to
temper domestic water draw.

Start-up

Before start-up all of the compo-

nents should be given a thorough
check. Optimal operation of this
equipment requires cleanliness. Of-
ten after installation of this equipment
additional construction activities oc-
cur. Care must be taken to protect
the equipment from debris during
these construction phases.

Heating Cycle Start-up
1) Fill the water heater. Open a hot
water faucet while filling the water
heater to vent the air. When the tank
is full and all the air is purged, close
the faucet.

2) Ignite the water heater and set the
thermostat to 140 degrees.
3) Purge the air handler’s hot water
coil and lines.

NOTE: It may require purging
several gallons of water so have a
means of discarding the water.

Close valve number 1 and open valve
number 2. (See figure 1) Next, open
the air bleed valve. When all of the air
is purged from the lines close valve
number 2 and open valve number 1.
After all the air is purged from the coil

HOT WATER
SUPPLY TO
HOUSE

WATER SUPPLY
TO HOT WATER

HEATER

ISOLATION VALVES (2)

FLOW

FLOW

TEE FITTINGS MUST
BE INSTALLED AS
SHOWN WITH "OFF LEG"
TO FAN COIL

RETURN AIR

DRAIN PAN
FITTINGS

LIQUID &
SUCTION
FITTINGS

POWER SUPPLY
KNOCKOUTS, L/R

LOW VOLTAGE, L/R

FILTER DOOR

AIR DISCHARGE

METHOD FOR WATER HEATER
INSTALLATION WITH CL*-AQ FAN COILS

(UNITS WITH INTEGRAL PUMP INSTALLED)

# 1

# 2

****** WARNING ******

Do not touch any rotating
component with any object.
Damage to the equipment and
personal injury can occur.