beautypg.com

Installation instructions – ELICA SEAGULL User Manual

Page 37

background image

en

37

Installation instructions

General: All of our extractor hoods are extensively tested before they leave

our facilities.

So as to make it easier to understand how the hood components fit together,

the extractor hood is supplied in separate units that comprise the hood (3),

hood base frame (1), cover plate (7) and the fan motors (11). These compo-

nents have to be installed as detailed in the following. Installing these parts

requires 2 specialists.

Make sure that there is a load bearing / suitable side
wall (fig. d) inside the base cabinet that is going to

bear the weight of the Seagull hood (~65KG).

Lift the Seagull hood out of its packaging (with two
people). Remove the housing cover (fig. C + f) from

the hood’s base frame. Screw the adjustable feet 10 to

the bottom of the hood’s base frame 1.

Cut out a section of the worktop to the specified
dimensions (fig. e).

Insert the hood’s base frame 1 into the base cabi-
net, align and, if necessary, adjust the feet 10 (fig. G,

h, i). Make sure that the hood shaft is flush with the top

edge of the worktop (fig. j).

Screw the hood’s base frame 1 to the intermediate
cabinet side wall using the new fastening holes and the

nine Spax screws (4.5x30). If necessary, check the

angle again (fig. K).

Clean the edges of the cut-out in the worktop (fig. L)
(remove oil and grease) and then remove the adhesive

foil from the magnetic strip and attach. Caution! Wide

side = front side.

Insert the cover plate 7 (fig. L+m) into the cut-out in
the worktop and fasten with two M3x9 screws.

Take the assembling aid (box) and remove the pre-
cut template. Place the assembling aid (fig. n) on top of

the worktop and insert the hood (3) into the template.

This manual is related to the following products: