Digi-Star AGCO - White 8816 User Manual
Page 6

Scale Bracket and Load Cell Mounting Installation
4
AGCO – White – 8800/8500 Series
D3879-US – Rev B
Load Cell Assemblies - 8800/8500 Series Load Cells
1. Assemble all level adjusting bolts to top bracket
weldment.
2. Assemble the load cell to the top base
weldment with two 3/4 x 3.50” bolt and 3/4” top
lock nut. Repeat for the two remaining load
cells.
3. Lift and support the front hopper support.
Remove the 1-1/8 x 4” pin that holds the hopper
support to the planter frame.
IMPORTANT
:
The lifting chains, bucket attachments,
loader/skid steer or winch must be capable of
lifting and controlling 1000-1500 lbs.
4. Mount the top base bracket weldment to the
hopper support leg with 1-1/8 x 4” bolt and 1-
1/8” top lock nut. The load cell needs to point
toward the front of the planter.
5. Use the 7/8” or 3/4” leveling bolts on the top
base bracket weldment to level the bracket.
Use existing 1-1/8” x 4.0” pin to mount the load
cell to the base bracket on the planter.
Repeat steps 3 – 5 for the rear two supports.