beautypg.com

Section 4: electrical installation, 1 installation overview, Section 4 – Daktronics BB-2101 Tuff Sport Basketball LED Scoreboard User Manual

Page 19: Electrical installation, Installation overview

background image

Electrical Installation

13

Section 4:

Electrical Installation

CAUTION: Only qualified individuals should access the electrical components of the display and its
associated equipment. It is the responsibility of the electrical contractor to ensure that all electrical
work meets or exceeds local and national codes.

Daktronics engineering staff must approve all changes or the warranty will be void.

4.1 Installation Overview

The diagram shown in Figure 7 illustrates a typical wired setup between a scoreboard and
the control system. Daktronics part numbers are shown in parentheses. Drawings A-124686,
A-124688, A-125415, and A-125417 in Appendix E also show power and signal layouts.

Note: Control signal cable and some junction boxes are not provided as part of this
system and can be purchased locally or from Daktronics.

Figure 7: Wired Installation

This manual is related to the following products: