Specifications – Contemporary Control Systems EIBA BAS Unmanaged Switches User Manual
Page 2
![background image](https://www.manualsdir.com/files/779078/content/doc002.png)
Specifications
Electrical
INPUT
DC
AC
Voltage:
10
–36 V 24 V ±10%
Power:
3 W
6 VA
Frequency:
N/A
47
–63 Hz
Class 2 Circuits Only
Environmental
Operating Temperature:
0°C to +60°C
Storage Temperature:
– 40°C to +85°C
Humidity, non-condensing:
10% to 95%
Protection:
IP 30
Mounting EIBA5-100T
panel mount
EIBA5-100T/R
TS-35 DIN-rail
Shipping Weight
1 lb (0.45 kg)
Regulatory Compliance
CE Mark; RoHS; CFR 47, Part 15, Class A
UL508 Industrial Control Equipment
Functional
Compliance:
ANSI/IEEE 802.3
Data Rates:
10 and 100 Mbps
Signalling:
10BASE-T and
100BASE-TX
Connectors:
Shielded RJ-45
Segment length:
100 m (maximum)
LED Indicators
Power
green
Activity/Link
green or yellow
RJ-45 Connector Pin Assignments
Pin
Function
1
TD+
2
TD
–
3
RD+
6
RD
–
(All other pins are unused.)
Mechanical
— EIBA5-100T
- AI-FR Redundant Fibre Hubs (9 pages)
- AI Active Hubs (40 pages)
- AI-SRVR Servers to Ethernet Installation Guide (12 pages)
- AI-USB Adapters (12 pages)
- AI-SRVR Servers to Ethernet User Manual (20 pages)
- PCX20 Adapters (16 pages)
- MODHUB Active Hubs (32 pages)
- PCI20EX Adapters (12 pages)
- QuickLink Active Hubs (8 pages)
- USB222 Adapters (8 pages)
- BAScontrol20 Installation Guide (16 pages)
- BASgatewayLX (16 pages)
- BASremote Installation Guide (20 pages)
- BAScontrol20 User Manual (53 pages)
- BASremote Application Guide (13 pages)
- BASremote User Manual (firmware 2.x) (78 pages)
- BASrouter Installation Guide (Firmware 2.7.x) (24 pages)
- BASrouter Portable Installation Guide (Firmware 2.7.x) (20 pages)
- BASrouterLX Successful BASrouter Installation and Operation (3 pages)
- BASrouterLX Installation Guide (12 pages)
- BASrouterLX Application Guide (20 pages)
- CAN104 (8 pages)
- CANPCI (8 pages)
- BASview (81 pages)
- Compact Unmanaged Switches (4 pages)
- EIDX Managed Automation Switches Installation Guide for PoE Models (8 pages)
- EIPR Wired/Wireless VPN Router Installation Guide (4 pages)
- EIDX Managed Automation Switches Software Manual for Console Access (80 pages)
- EISK Managed Skorpion Switches Software Manual (83 pages)
- EIS UL864-Compliant Switches (8 pages)
- EISC Configurable Switches Installation Guide (8 pages)
- EISK Skorpion Switches EISK8-GT (4 pages)
- EISK Managed Skorpion Switches Installation Guide (4 pages)
- EIPR Wired/Wireless VPN Router Application Guide (14 pages)
- EISC Configurable Switches User Manual (36 pages)
- EISK Skorpion Switches EISK5-100T/FCS (4 pages)
- BACnet Cube I/O BMT-DI4 (3 pages)
- BACnet Cube I/O BMT-DI10 (3 pages)
- BACnet Cube I/O BMT-AI8 (4 pages)
- BACnet Cube I/O BMT-SI4 (3 pages)
- BACnet Cube I/O BMT-DO4 (3 pages)
- BACnet Cube I/O BMT-AO4 (3 pages)
- Sedona (27 pages)
- BACnet Cube I/O BMT-DIO4/2 (4 pages)