Specifications, Environmental, Regulatory compliance – Contemporary Control Systems QuickLink Active Hubs User Manual
Page 2: Functional, Power requirements, Mechanical, Installation

SPECIFICATIONS
Environmental
Operating temperature:
0°C to +60°C
Storage temperature:
–40°C to +85°C
Relative humidity:
10 to 95%, non-condensing
Regulatory Compliance
CE Mark
CFR
47, Part 15 Class A
Functional
Compliance:
ANSI/ATA 878.1
Hub delay:
300 ns max @ 2.5 Mbps
Unlatch delay time:
5.9
µ
s max @ 2.5 Mbps
LED Indicators:
ACTIVITY
⎯
green
AC
Input voltage:
8–24 Volts
Input power:
6 VA
Input frequency:
47–63 Hz
INSTALLATION
The QL was designed as a desktop unit and should be installed on a stable
surface in a horizontal plane. Four rubber feet protect the mounting surface.
Power is derived from
a nominal 24 VAC source, either a local power
supply or the wall-mounted transformer provided with the QL. This trans-
former is normally for a 120 VAC mains, but (-E) models are supplied with
a 230 VAC transformer.
TD990300-0I
H
2
Power Requirements
Mechanical
- AI-FR Redundant Fibre Hubs (9 pages)
- AI Active Hubs (40 pages)
- AI-SRVR Servers to Ethernet Installation Guide (12 pages)
- AI-USB Adapters (12 pages)
- AI-SRVR Servers to Ethernet User Manual (20 pages)
- PCX20 Adapters (16 pages)
- MODHUB Active Hubs (32 pages)
- PCI20EX Adapters (12 pages)
- USB222 Adapters (8 pages)
- BAScontrol20 Installation Guide (16 pages)
- BASgatewayLX (16 pages)
- BASremote Installation Guide (20 pages)
- BAScontrol20 User Manual (53 pages)
- BASremote Application Guide (13 pages)
- BASremote User Manual (firmware 2.x) (78 pages)
- BASrouter Installation Guide (Firmware 2.7.x) (24 pages)
- BASrouter Portable Installation Guide (Firmware 2.7.x) (20 pages)
- BASrouterLX Successful BASrouter Installation and Operation (3 pages)
- BASrouterLX Installation Guide (12 pages)
- BASrouterLX Application Guide (20 pages)
- CAN104 (8 pages)
- CANPCI (8 pages)
- BASview (81 pages)
- Compact Unmanaged Switches (4 pages)
- EIBA BAS Unmanaged Switches (4 pages)
- EIDX Managed Automation Switches Installation Guide for PoE Models (8 pages)
- EIPR Wired/Wireless VPN Router Installation Guide (4 pages)
- EIDX Managed Automation Switches Software Manual for Console Access (80 pages)
- EISK Managed Skorpion Switches Software Manual (83 pages)
- EIS UL864-Compliant Switches (8 pages)
- EISC Configurable Switches Installation Guide (8 pages)
- EISK Skorpion Switches EISK8-GT (4 pages)
- EISK Managed Skorpion Switches Installation Guide (4 pages)
- EIPR Wired/Wireless VPN Router Application Guide (14 pages)
- EISC Configurable Switches User Manual (36 pages)
- EISK Skorpion Switches EISK5-100T/FCS (4 pages)
- BACnet Cube I/O BMT-DI4 (3 pages)
- BACnet Cube I/O BMT-DI10 (3 pages)
- BACnet Cube I/O BMT-AI8 (4 pages)
- BACnet Cube I/O BMT-SI4 (3 pages)
- BACnet Cube I/O BMT-DO4 (3 pages)
- BACnet Cube I/O BMT-AO4 (3 pages)
- Sedona (27 pages)
- BACnet Cube I/O BMT-DIO4/2 (4 pages)