Inlets closure – Blu Bathworks TSP421 User Manual
Page 5
2013-07
1 866 907 0122 blubathworks.com
®
4
INSTALLATION
Inlets Closure
•
Install the two closure valves: one for the cold inlet and one for
the hot inlet.
•
Screw the flexible pipe for cold water at the cold closure valve¸
screw the flexible pipe for hot water at the hot closure valve.
•
Remember to use the filter with gaskets.
•
Turn the handle of the closure valve counter-clockwise to open
the water flow.
See also other documents in the category Blu Bathworks For Home:
- BEP002 (7 pages)
- BCM4214 (6 pages)
- BCA971M (9 pages)
- BCA141MR (10 pages)
- BCT180 (6 pages)
- SA1810 (6 pages)
- BCS14N (10 pages)
- BCS18N (10 pages)
- BT8004B168 (10 pages)
- BT0408 (8 pages)
- BCZ915C X2 (13 pages)
- SA2018B (4 pages)
- SA1018C (4 pages)
- SB9250 (10 pages)
- SA3023 (5 pages)
- SA0208 (6 pages)
- SA0110 (7 pages)
- SA0507 (5 pages)
- LSeat-006 (12 pages)
- LF8004 (14 pages)
- LW6030 (11 pages)
- LB9030 (6 pages)
- TSP611 (7 pages)
- TSU611 (7 pages)
- TF500 (6 pages)
- TF800 (6 pages)
- TF514 (9 pages)
- TF260 (9 pages)
- TSP511 (11 pages)
- TSU510 (10 pages)
- TEP421 (20 pages)
- TSU431 (11 pages)
- TEE200 (19 pages)
- TSP101 (7 pages)
- TSU140 (13 pages)
- TEP131 (17 pages)
- TEU131 (17 pages)
- TSP141 (9 pages)
- TSP131 (10 pages)
- TSU101 (7 pages)
- TSU131 (10 pages)
- TSU141 (9 pages)
- TSP211 (6 pages)
- TSU211 (6 pages)