Revision history – Basler Electric BE1-50/51B-218 User Manual
Page 5

9252000995 Rev H
BE1-50/51B-218/-228 Introduction iii
REVISION HISTORY
The following information provides a historical summary of the changes made to this instruction manual
(9252000995). Revisions are listed in reverse chronological order.
Manual
Revision and Date
Change
H, 01/09
Updated
Storage statement in Section 4.
Modified Figure 5-2, Target Operational Test Setup.
In Section 5, modified Target Test so that TIME and INST targets
can be verified independently from each other.
Minor text edits throughout manual.
G, 03/08
Updated front panel drawings to show new reset button.
Updated descriptions of targets and reset button.
F, 01/07
Moved Time Characteristic Curve Figures to Appendix A.
Added manual part number and revision to footers.
E, 12/06
Updated Figure 4-1, Outline Dimensions for Case S1.
Updated Figure 4-2, Panel Drilling Diagram for Case S1.
Moved Revision History to the front of manual.
D, 02/03
Changed manual to cover the BE1-50/51B-228 in addition to the
BE1-50/51B-218.
Re-organized the specifications in Section 1.
C, 12/00
Updated drawings in Section 2 to reflect changes to the PC board.
Also updated the rest of the manual to reflect the change in switch
call out from SW8 to SW3.
Added new functionality to the PICKUP LED. It is now the
ACTIVE/PICKUP LED and will be green when active and red when
picked up.
B, 12/99
Changed all references to target test current to one ampere
alternating current.
A, 05/98
Added Patent number to Specifications. Changed manual format to
reflect the current style.
—, 03/96
Initial
release