Vent Requirements

Always maintain the
required 1" clearance (2"
clearance above the vent
when an elbow is placed
directly off the top of the
fireplace) to combustible
materials to prevent a fire
hazard. Do not fill air
spaces with insulation.

The gas appliance and vent
system must be vented
directly to the outside of
the building, and never be
attached to a chimney
serving a separate solid
fuel or gas-burning
appliance. Each direct
vent gas appliance must
use it's own separate vent
system.

In addition to the
requirements below, follow
the requirements provided
with the vent.

Altitude
Considerations

Use a firestop spacer whenever

passing through a ceiling

(Duravent Part #963)

Vertical Termination

(Duravent Part # 991)

Use a roof flashing and storm collar

whenever passing through the roof

(Duravent Part #953 & #943 or #943S)

8-5/8"

(220 mm)

Use a support box

on exposed vent

Vertical Vent

Requirements

Use a firestop whenever

passing through a wall

Horizontal Termination

(Duravent Part #984)

Maintain a minimum 1" clearance from

vent to any combustible (2" above the

vent when an elbow is placed directly

off the top of the fireplace).

Minimum

Framing for

wall thimble

Horizontal Vent

Requirements

Minimum framing

for fire stop

8-5/8"

(220 mm)

Maintain a minimum 1"

(25 mm) clearance from

vent to any combustible

(vent is 6 5/8" (170 mm)

diameter)

6-5/8" Diameter

-

This heater has been tested at altitudes ranging from sea level to 8,000 feet (2,400 M). In this testing we have found that
the heater, with its standard orifice, burns correctly with just an air shutter adjustment.

-

Failure to adjust the air shutter properly may lead to improper combustion which can create a safety hazard.
Consult your dealer or installer if you suspect an improperly adjusted air shutter.

Approved Vent

Use of of the following 6-5/8" diameter co-axial gas direct vent systems:

Manuafacturer

S e r i e s

Simpson Dura-Vent

Model GS

Selkirk Hearth Products

Direct-Temp

American Metal Products

Ameri-Vent

N O T E

: Always use the high-wind cap for the type of vent you are using (if applicable)

Slide the vent sections together and turn 1/4 turn until the sections lock in place.

Screws are not required to secure the vent. However, three screws may be used to secure
vent sections together if desired.

High temperature sealant is recommended at the appliance starter section connection (use
high-temperature silicone or Mill-Pac®).

If disassembly is required, at time of re-assembly check to see if the vent creates a tight fit. If
it does not, apply high temperature sealant to the joints of the affected sections.

Horizontal sections require a 1/4" rise every 12" of travel

Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)