beautypg.com

Hardware preparation and installation – Artesyn RTM ATCA-F140 Installation and Use (September 2014) User Manual

Page 27

background image

Hardware Preparation and Installation

RTM-ATCA-F140 Installation and Use (6806800M97G)

27

5. Fully insert the blade and then push the handle inwards. The latch automatically locks the

handle.

6. Tighten the face plate screws which secure the RTM to the shelf.

7. If the front blade has already been installed (as in step 2), activate the front blade by

pressing it back into the face plate.

8. If the front blade has not been installed, proceed with the installation instructions in the

front blade installation and use manual.

When the RTM's blue LED is switched OFF and the green LED "OK" is switched ON, this
indicates that the RTM’s payload has been powered up and that the RTM is active.

9. Connect cables to the face plate, if applicable.

Make sure that the handles of both the RTM and the front blade are closed in order to power
up the blade and RTM payload.