beautypg.com

Pl - plasma lift – Future Automation PL User Manual

Page 6

background image

In

st

al

la

ti

o

n

:

S

ta

ge

1

Page 5 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

PL - Plasma Lift

Before you Start

Check the Operation of the Mechanism.
Firstly, remove all the red cable ties which keep the mechanism safe and secure during
transit. There are usually 6 ties in the locations circled on the image.
However, on some models there may be more than 6 cable ties.
Once they have all been removed, the mechanism can be powered up and tested.
Connect the supplied IR remote and check that the mechanism operates correctly before
continuing with the installation.

IMPORTANT
When testing the mechanism, make sure that the straps that pull the lifting beam up are not
in any way twisted. They must remain perfectly straight from top to bottom. If this is not the
case, then take care when straightening. Also make sure that the straps are stacking neatly
when wrapping around the tubes.

This manual is related to the following products: