Pl - plasma lift – Future Automation PL User Manual
Page 10

In
st
al
la
ti
o
n
:
S
ta
ge
5
Page 9 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PL - Plasma Lift
Positioning the Base Panel
Loosen off the frame and move the base to the centre of the opening.
There should be a gap of about 3mm around the edges of the base
panel to the cabinet.
You will also have to cut a
hole in the base panel to allow
the cables to pass up through
to the plasma screen.
The location of this hole will
depend on the screen type
that is going to be used.