beautypg.com

Brennenstuhl Gas Detector BG 2201 User Manual

Page 16

background image

4.3 Installation and set-up
• Before beginning installation, shut off the

electricity in order to prevent electric shock or
damage to the device.

• After selecting the mounting site, make sure

that there are no electrical lines or pipes in the
mounting area.

• Mount the mounting ring in the right place.
• Drill holes in the marked locations.
• Insert anchor bolts in the drilled holes.
• Screw on the mounting ring. DO NOT OVER-

TIGHTEN THE SCREWS.

• Screw the detector onto the mounting ring,

paying attention to the openings for the adapter
plug.

• Connect the power cord for the12 V DC power

supply/transformer. In the case of direct
connection to a 12 V DC battery, a switch can be
installed between the battery and the device.

• Connect the transformer to a 230 V electrical

outlet. The gas detector will be operationally
ready in 2 minutes. The green light will burn
continuously.

• If you are not sure about the type of gas used,

or if problems occur during the installation of
your gas detector, consult a trained technician.

16

Operating Instructions

BG 2201

044009 Erdgas-Methangasmelder BG 2201 30.04.2010 9:35 Uhr Seite 16

This manual is related to the following products: