ABtUS AV418 User Manual
Page 5
*Specifi cations are subject to changes without notice.
Step - 3a - insert Clamp plate-2 (in item-8)into other end of Cross pole. Secure with M6x55 socket
cap screws and hexagon nut (“L” in item-10).
Step - 3b - fi x Left side plate (item-7) at end of Cross pole (in item-8). Align and match with Angle
bars. Secure with 2x M8X15 socket cap screws (“L” in item-10).
Step - 3c - fi x Clamp plate and secure with 3x M8x15 socket cap screws.
Step - 3d - fi x Linkage bar (item-9) as shown with Spacer-I and Spacer-II (“G” in item-10). Secure with
M8x15/washer (“I” in item-10) and M8x25/nut (“J” in item-10)socket cap screws.
Step - 4a - insert Top pole (item-2) into short pipe of Ceiling plate (item-1) and secure with 2x M10x60
socket cap screws and hexagon nuts (“M” in item-10).
Step - 4b -locate and fi x Ceiling plate with Top pole with 6x M10 Expansion bolts (item-11).
Step - 4c - lift and insert the pole of the assembled Lower pole assm (in Step-2 and Step-3). Secure
with 2x M10x60 socket cap screws and hexagon nuts (“M” in item-10).
Cross pole
Clamp plate-2
Angle bar
Spacer-
I I
Spacer-
I
Linkage bar
Clamp plate
Left side plate
Expansion
bolts
Short
pipe
Ceiling
plate
Top pole
insert
insert