ABtUS AV815 User Manual
Page 10
INSTALLATION GUIDE
3. Installation of Universal Ceiling Mounting Kit
* Please consult our authorized service person when you meet any trouble in
installation. We are not liable for any damage or injury caused by mishandling
or improper operation.
3.2
Install the Universal Base Plate with the
projector (B) using M8x55 Socket Cap
Screw and M8 Self-locking Nylon Nut,
to joint A and B togather.
3.1
Install the Universal Ceiling Mounting
Kit to the ceiling. Fix Suspension Rod
by M10 expansion bolt (not included)
on the ceiling.
Refer to drawing.
3.3
Installtion completed.
Put screw into
cross adapter by
this hole
See also other documents in the category ABtUS Accessories for video:
- AV890-1500 (2 pages)
- AV891WS-1500-V1 (8 pages)
- AV820 (2 pages)
- AV817 (8 pages)
- AV602-TC (2 pages)
- AV601-RW (2 pages)
- AV813 (12 pages)
- AV601-D (2 pages)
- AV601-RS (2 pages)
- AV565-WT (2 pages)
- AV545-W2 (2 pages)
- AV545-W (2 pages)
- AV565-WT2 (2 pages)
- AV541 (2 pages)
- AV511 (2 pages)
- AV540 (2 pages)
- AV509 (2 pages)
- AV508-WP5 (2 pages)
- AV508-S (2 pages)
- AV508-WP1 (2 pages)
- AV508-DV (8 pages)
- AV508-D (2 pages)
- AV502-S (2 pages)
- AV483-L360A (2 pages)
- AV480-WT (2 pages)
- AV480-W2T (2 pages)
- AV420W-V1 (2 pages)
- AV419 (2 pages)
- AV418 (8 pages)
- AV417-V1 (8 pages)
- AV415W-XL (2 pages)
- AV417 (2 pages)
- AV410-P (2 pages)
- AV410-L (2 pages)
- AV415-W (10 pages)
- AV382-V1 (2 pages)
- AV383W6 (12 pages)
- AB2123308 (8 pages)
- AB2123108 (4 pages)