beautypg.com

Venting installation instructions – Desa (V)T36ENA User Manual

Page 12

background image

www.desatech.com

111251-01E

12

CORNER AND ALTERNATE INSTALLATION

Recommended Applications:

• Corner ground floor installation

• Ground floor installation where pipe vents horizon-

tally through wall (over 12" horizontal pipe)

• Basement installation where one foot clearance

from ground to termination is possible

VENTING INSTALLATION INSTRUCTIONS

Continued

Figure 15 - Horizontal Termination Configuration for Corner Installation Using One

90° Elbow

Square
Termination

Wall
Firestop

Not to Exceed (H) Limits

As Required
for (V), See
Chart for
Pipe Section
Required

45° Elbow

90° Elbow

90° Elbow

Square
Termination

Wall
Firestop

45° Elbow

12" Min.

Required

Vertical (V)

Vertical Pipe Horizontal (H)

*43

1

/

4

" min.

None

30" max.

54

1

/

4

" min.

1 ft.

48" max.

1

/

4

" min.

2 ft.

0" max.

78

1

/

4

" min.

3 ft.

84" max.

90

1

/

4

" min.

4 ft.

20' max.

* Ground Floor Corner Venting

Not to Exceed
(H) Limits

SNORKEL TERMINATION INSTALLATION

Recommended Applications:

• Installations requiring a vertical rise on building exterior

• Any installation using snorkel termination to achieve one foot above ground

Snorkel terminations are available for installations requiring a vertical rise on the exterior of the building.

If installing snorkel termination below grade, you must provide proper drainage to prevent water from

entering snorkel termination (see Figure 16). Do not back fill around snorkel termination.

Snorkel Termination

12"
Min.

Snorkel
Termination

Wall
Firestop

90° Elbow

45° Elbow

Figure 16 - Snorkel Termination Configurations for Below Ground Installation

Snorkel Termination

Adequate
Drainage

12" Min.

12" Min.