beautypg.com

Selecting the unit id number – StorCase Technology S20A124 User Manual

Page 19

background image

12

Installation

StorCase Technology, Inc.

S20A124 User's Guide - Rev. B01

8.

Connect the power cable from the DC power supply in the computer or expansion

chassis to the power connector on the DE300 receiving frame. Refer to Figure

5 for the DE300 receiving frame power connector location.

9.

Replace any expansion boards that may have been removed earlier. Replace

the system cover according to the manufacturer’s instructions.

10.

Reconnect any system or peripheral cables removed earlier.

11.

Turn ON power to the computer. If the installation has been successful, and all

cables have been properly attached, the system should boot normally. Although

the computer may not recognize the DE300 yet, the appropriate front panel LED

indicators on the DE300 should illuminate.

NOTES:

The lock on the DE300 receiving frame functions as a lock and a DC power

switch for the carrier unit. The lock MUST be engaged (turned counter-

clockwise) in order to supply power to the carrier and installed drive unit.

The built-in blower will NOT turn on if there are no drives installed! A

minimum of one (1) drive installed (with the key lock engaged) is required
to activate the built-in blower.

12.

The new drives may need to be formatted or initialized prior to use with the

operating system and applications software. Refer to the drive and/or computer

manufacturer's documentation for formatting information.

Selecting the Unit ID Number

1.

Verify that power is turned on to the DE300 receiving frame by turning on the

computer or external expansion chassis. Numbers should appear in the unit

ID display windows if the carriers are locked into place.

2.

Unlock the DE300 drive carrier. The unit ID number will begin flashing, indicating

that the drive is spinning down. The length of time that the unit ID number flashes

is controlled by a small timing switch located on the side of the receiving frame.

Refer to Figure 10 for the location of the Device Spin Down/Up Timer Switch

on the receiving frame. A "u" will be displayed once the drive has completed

spin down and is ready to be removed from the receiving frame. The indicator

will return to the SCSI ID number when the carrier is removed from the receiving

frame.

WARNING:

Unlocking the carrier unit switches DC power off to the drive.

Since disk drives require a short amount of time to spin down,

allow about 15 seconds before pulling the carrier unit out of the

receiving frame to avoid possible damage to the drive.

3.

Use the alignment tool supplied with the DE300 to select the ID number of the

disk drive. Refer to Figure 9 for the location of the Unit ID Select Switch inside

the receiving frame.