6. Connect the gas inlet of the pressure regulator to the building’s supply system. No segment of the gas
supply connection to the appliance should be smaller than 3/4" NPT. Standard pipe fittings are
required.
7. Turn on gas supply.
8. Check for leaks using soapy water.
Figure 4
Step 5: Final Positioning, Clearance Check, and Ventilation Check
1. Position the appliance where it will be operated.
2. Check that the appliance surface is level. The length of each leg is adjustable by screwing the bottom
portion of the leg in or out. The appliance must be level for proper operation!
3. Check for adequate clearances around the appliance (see page 5).
4. Check for adequate ventilation (see page 5).
NOTICE
In the Commonwealth of Massachusetts all gas appliances vented by either mechanical systems or
ventilation hoods shall comply with 248 CMR interlocking requirements.