beautypg.com

Lingenfelter L250090309 Lingenfelter C6 ZR1 Corvette Supercharger Pulley 2009-12 v1.2 User Manual

Page 20

background image

Page 19.

66. Remove the cap on the pulley by using a

small flat head screwdriver and prying up.

67. Using a pulley removal tool, remove the

factory pulley from the supercharger front cover.

Please note that an LSA front cover was

used to illustrate steps 72-76. The pinning

process is the same for these front covers.

65. Remove the old dowell sleeves from the

front cover/housing. Install the supplied dowel

sleeves into the LS9 supercharger housing.

Install the sleeves in the bottom left and bottom

right hand corner of the supercharger housing.

DO NOT install sleeves on the front cover.

NOTE: Some early engines may not have a

dowel sleeves in the cover. Dowel sleeves

should be used on these early engines as well.

See example image for correct location.

68. If you are using a 2.55” or smaller pulley,

you will need to partially remove the fixturing

tabs on the casting of the front cover shown to

the left.