beautypg.com

Installation – Desa CTR25NR User Manual

Page 11

background image

www.desatech.com

11

113261-01C

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping

and connections, internal and

external to unit, for leaks after

installing or servicing. Correct

all leaks at once.

WARNING: Never use an open

flame to check for a leak. Apply

a noncorrosive leak detection

fluid to all joints. Bubbles form-

ing show a leak. Correct all leaks

at once.

CAUTION: For propane/LP

gas, make sure external regula-

tor has been installed between

propane/LP supply and heater.

See guidelines under

Connect-

ing to Gas Supply, page 10.

PRESSURE TESTING GAS SUPPLY
PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)
1. Disconnect appliance with its appliance main

gas valve (control valve) and equipment

shutoff valve from gas supply piping system.

Pressures in excess of 1/2 psig (3.5 kPa) will

damage heater regulator.

2. Cap off open end of gas pipe where equipment

shutoff valve was connected.

3. Pressurize supply piping system by either

opening propane/LP supply tank valve for

propane/LP gas or opening main gas valve

located on or near gas meter for natural gas

or using compressed air.

4. Check all joints of gas supply piping system.

Apply a noncorrosive leak detection fluid to

all joints. Bubbles forming show a leak.

5. Correct all leaks at once.
6. Reconnect heater and equipment shutoff valve to

gas supply. Check reconnected fittings for leaks.

INSTALLATION

Continued

Tee Pipe Cap

Joint Nipple

Tee Joint
Reducer
Bushing to
1/8" NPT
1/8" NPT
Plug Tap

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessory, page 22.

Figure 13 - Gas Connection

Pressure
Regulator

T

es

t G

au

ge

C

on

ne

ct

io

n*

Heater
Cabinet

Sediment Trap

Equipment
Shutoff
Valve *

3"
(76 mm)
Min.

Natural Gas

From Gas Meter

[7" (1.8 kPa) WC to
10.5" (2.6 kPa) WC

Pressure]

Propane/LP

From External Regulator

[11" (2.7 kPa) WC to 14"

(3.5 kPa) WC Pressure]

Regulator
Bracket

Ground
Joint
Union

3/8" NPT
Pipe
Nipple

Install sediment trap in supply line as shown in

Figure 13. Locate sediment trap where it is within

reach for cleaning. Locate sediment trap where

trapped matter is not likely to freeze. A sediment

trap traps moisture and contaminants. This keeps

them from going into heater controls. If sediment

trap is not installed or is installed wrong, heater

may not run properly.
IMPORTANT:

Hold the pressure regulator with

wrench when connecting it to gas piping and/or

fittings. Do not over tighten pipe connection to

regulator. The regulator body could be damaged.

This manual is related to the following products: