Once the site for your glove box is properly prepared, you are ready to
unpack, inspect, install, and validate performance of your system. Read this
chapter to learn how to:
• Unpack and move the glove box.
• Set up the glove box with the proper supporting structure and work
surface.
• Connect an exhaust system to the pressure relief valve (if applicable).
• Install the gloves.
• Connect the electrical supply.
• Connect the plumbing lines for gas, vacuum, and drying train.
• Validate performance of the glove box.
Each Precise Glove Box model weighs 185 lbs. each (83
kg). The shipping container allows for lifting with a
mechanical lift truck or floor jack. If you must lift the
glove box manually, follow safe-lifting guidelines. Do not
lift by the upper sheet metal façade and front panel as
damage can occur to the glove box liner.
!
- Precise Controlled Atmosphere and Basic Glove Boxes 5220130 Precise Controlled Atmosphere and Basic Glove Boxes 5220121 Precise Controlled Atmosphere and Basic Glove Boxes 5220120 Precise Controlled Atmosphere and Basic Glove Boxes 5220100 Precise Controlled Atmosphere and Basic Glove Boxes 5220031 Precise Controlled Atmosphere and Basic Glove Boxes 5220030 Precise Controlled Atmosphere and Basic Glove Boxes 5220021 Precise Controlled Atmosphere and Basic Glove Boxes 5220020 Precise Controlled Atmosphere and Basic Glove Boxes 5220000