beautypg.com

5 boiler installation – Glow-worm Micron 60FF User Manual

Page 15

background image

15

2000225228C

5 Boiler Installation

Diagram 5.6

BLANKING

PLATE

SCREWS (4)

7150

5.5 Gas Connection

Make the gas connection to the Rc

1

/

2

in gas service cock, see

diagram 6.2.

The whole of the gas installation, including the meter, should be
inspected, tested for soundness and purged in accordance with
the current issue of BS6891 and in IE the current edition of
I.S.813 "Domestic Gas Installations".

5.6 Control Box Access

Slacken the control box securing screw, see diagram 5.10.
Swing the box out on its hinge.

5.7 Electrical Connection

WARNING: This boiler must be earthed.

NOTE: If an optional programmer is to be installed, it should be
fitted at this stage, see separate installation instructions supplied
with programmer

Take care not to damage any internal wiring.

Using heat resistant (85

o

C) cable of at least 0.75mm

2

(24/

0.2mm) and of a suitable length, thread through the grommet at
the rear of the control box, through the cable clamp and connect
to appropriate terminals. Tighten cable clamp screws, see
diagram 5.10.

Standard colours are, brown - permanent live (Lp), black -
switch live (Ls), blue - neutral (N) and green/yellow - earth ( ).

A switch live should be connected from an external control. If no
external control available insert a link between Lp & Ls.

The mains cable outer insulation must not be cut back external
to the cable clamp.

Make sure the cable is suitably secured.

GASKET

SCREWS

(4)

SPIGOT

REAR FLUE FIXING

TOP FLUE FIXING

7663

FLUE DUCT
EXTENSION

RETAINING
CLAMP

FAN
ELBOW

PRESS

PRESS

PRESS
CLASP

Diagram 5.7

JUBILEE
CLIP

REAR
CONNECTION
(within casing)

FLUE
DUCT
EXTENSION

TOP
CONNECTION

JUBILEE
CLIP

FAN ELBOW

TOP
TURRET

6791

9355

RETAINING
CLAMP

" O " RINGS

FAN ELBOW
CLAMPING
SURFACE

NIBS