beautypg.com

8 mounting the boiler – Glow-worm Compact 100E User Manual

Page 17

background image

17

221894A

8.2 Water and Gas Connections

Locate the boiler water pipes and gas supply pipe making sure
the washers are retained in the tubing nuts onto the isolation
valves, fully push the boiler back, see diagram 8.8.

Ensure the bottom boiler bracket is sitting on top of the service
cock bracket, see diagram 8.6.

Secure all the tubing nuts finger tight, plus

3

/

4

turn maximum.

Connect the gas pipe to the isolation valve ensuring that the
sealing washer (supplied fitted) is in position.

8.3 Boiler Securing

Secure the boiler to the service cock bracket with the screws
provided in the fittings pack, see diagram 8.6.

An anti theft kit is available, Kit No. 457110.

8.4 Discharge Pipe

Fit the short discharge pipe to the safety valve using the nut and
sealing washer supplied in the fittings pack, see diagram 8.9.

Extend the discharge pipe, using only a compression type fitting
to join the discharge extension, refer also to Section 6.4 “Safety
Valve Discharge”.

8.5 Rear Outlet Flue Fixing

Make sure that the ductings do not slope down towards the
boiler.

Fit the air duct into the flue spigot by pulling the air duct into the
flue, locating cutouts. Turn the air duct anti-clockwise to lock the
tabs into the cutouts, see diagram 8.10.

8 Mounting the boiler

7303

Diagram 8.4

RESTRICTOR
PLATE

7304

Diagram 8.5

FLUE
SPIGOT

SECURING
SCREW (3)

AIR PRESSURE
SWITCH

SECURING
SCREW (3)

Diagram 8.6

SECURING SCREW

6955

TOP MOUNTING
BRACKET

BOILER

RETAINING LUG

SERVICE COCK
BRACKET

BOILER BRACKET
(On Top)

HAND
HOLES

GASKET