beautypg.com

7 on-roof installation – Glow-worm Clearly Solar Vertical On-Roof Collector User Manual

Page 15

background image

15

7 On-Roof Installation

Diagram 7.5

15170

With regards to the hydraulic system you have chosen, insert

and secure the hydraulic connections, see diagrams 7.5 and

7.6.

Connect the collector to the system circuit.

Ensure that all of the following steps have been performed:-

- All the connections have been fixed with securing clips.

- All hydraulic connections laid properly.

- The collector sensor has been connected.

- The collectors are connected to a lightning protection

device.

- A pressure test carried out and all connections are tight.

- All insulation is intact.

NOTE: After initial commissioning and according to the

season, high outside temperature oscillations can cause

condensation in the collector, this is normal.

Diagram 7.6

15171

COLLECTOR SENSOR

COLLECTOR SENSOR

1 - 5 Collectors

6 or more Collectors