7 on-roof installation, 1 collector installation – Glow-worm Clearly Solar Vertical On-Roof Collector User Manual

Page 13

background image

13

7 On-Roof Installation

7.1 Collector installation

Ensure the mounting brackets are level before securing, see

diagram 7.1.

Position the collector, protective side uppermost, on the

mounting bracket and beneath the clamp, see diagram 7.2.

NOTE: The design is symmetrical and does not have a top or

bottom.

IMPORTANT: Do not remove the protective film until the

system is to be commissioned.

Move the clamp into position ensuring the correct

engagement of both clamps onto the collector.

Secure the clamps.

Diagram 7.1

15164

Diagram 7.2

15165

STRAIGHT EDGE

COLLECTOR CLAMP (UPPER)

MOUNTING

BRACKET