ROOFTOP UNIT (RTU) AND ENERGY RECOVERY SECTION (62AQ) START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

RTU

62AQ

II. PRE-START-UP (insert checkmark in box as each item is completed)

VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS

CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

CHECK THAT SUPPLY AND EXHAUST HOODS ARE INSTALLED AND AIR FILTER(S) ARE CLEAN AND IN

PLACE

CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS (62AQ300 BELT

DRIVE EXHAUST FAN AND SUPPLY FAN)

III. START-UP

COMBINED ELECTRICAL (COBRA ENERGY RECOVERY UNIT)

TEMPERATURES

PRESSURES (IN COOLING MODE)

ROOFTOP UNIT

VERIFY REFRIGERANT CHARGE USING CHARGING CHART LABEL ON UNIT.

62AQ

VERIFY REFRIGERANT CHARGE USING CHARGING CHART LABEL ON UNIT.

COBRA™ ENERGY RECOVERY UNIT MODEL NO.:

SERIAL NO.:

/

BASE UNIT MODEL NO.:

SERIAL NO.:

/

DATE:

TECHNICIAN:

/

SUPPLY

VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR

AMPS

L1

L2

L3

INDOOR FAN AMPS

L1

L2

L3

OUTDOOR-AIR TEMPERATURE

DB

WB

RETURN-AIR TEMPERATURE

DB

WB

ENTERING SUPPLY-AIR (RTU)

DB

WB

LEAVING AIR TEMPERATURE (RTU)

DB

WB

REFRIGERANT SUCTION

PSIG

TEMP AT COMPRESSOR

F

REFRIGERANT DISCHARGE

PSIG

TEMP AT COMPRESSOR

F

REFRIGERANT SUCTION

PSIG

TEMP AT COMPRESSOR

F

REFRIGERANT DISCHARGE

PSIG

TEMP AT COMPRESSOR

F