beautypg.com

Maintenance checksheet – Bard 2100-066 Rev. A User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Maintenance Checksheet

Dealer___

_________________________________________

Customer

Date

Person

Address

Address

Time In

Time Out

Equipment Make & Models

Notes

________

Pre-Service Check

n Customer satisfied with system performance

□ Customer dissatisfied with system performance.

Thermostat Checks

□ Record thermostat settings: Temp.;_____________

Mode: HEAT OFF COOL FAN ON AUTO

□ Check terminal connections for tightness

n Clean bimetal. Inspect mercury switch

n Check thermostat for level

□ Check control circuit amperage;________________

D If customer dissatisfied with temperature control in heating season, adjust

anticipator to match control circuit amp draw

□ Initiate appropriate seasonal demand from thermostat

Blower Compartment Checks

n Check supply voltage at junction box; _

□ Check blower motor amperage;______

_________ time

nameplate rating

□ Turn power at unit main disconnect to OFF

n Check alt wiring for loose connections and bad insulation

D

Clean or change filter

Direct Drive Blower

n Check blower bearings

□ Lubricate blower bearings

□ Clean blower and compartment

□ Check blower wheel for free and balanced rotation

D

Check all blower housing mounts and setscrews for tightness

□ Unused motor leads taped and out of way

Beit Drive Blower

n Remove biower belt and check for wear

□ Check motor bearings for wear

□ Lubricate motor bearings

□ Check blower wheel bearings for wear

n Lubricate biower wheel bearings

n Clean blower and compartment

D

Check blower wheel for free and balanced rotation

□ Check pulley alignment

□ Check motor and blower pulley setscrews for tightness

D

Put belt back on blower and motor pulley and check belt tension

□ Check all biower housing and motor mounts for tightness______

Heating Section Checks
Electric

□ Check electrical wiring — connections and insulation

□ Check amperage draw of each element

□ Check total amperage draw of elements___________

□ Check temperature rise________________________

amps

F

n Return outdoor thermostats to original settings if present

Gas

□ Check ail electrical wiring for loose connections and damaged insulation

D

Check burners for lint, dust and scale

□ Check for cracks in heat exchanger

G

Check furnace vent for size and deterioration

□ Check for quiet, even burner ignition

□ Check supply line gas pressure NAT________ in. w.c, LP____________in. w.c.

D

Check manifold gas pressure NAT________ in. w.c. LP____________ in. w.c.

Electronic Ignition Control

□ Check electronic ignition control sequence of operation

D

Check safety lockout____________________ min.

n Check pressure switch_____________________

dcmv closed circuit _

_______________ min.

Standing Pilot

□ Check pilot flame

□ Check thermocouple open circuit____
□ Check pilot valve safety drop>aut time _

□ Check automatic vent damper system

□ Check iimit safety

□ Check temperature rise_________________ “F

□ Gas manifold hand valve is open before leaving

Oil

□ Check electrical wiring — connections and insulation

n Inspect combustion chamber

D inspect for soot in heat exchanger

□ Change fuel oil tank for sludge/watar

□ Change oil line filter

□ Check oil lines

D Service oil burner
□ Conduct combustion efficiency test:

__________ in.w,c, smoke_______________ %

C02.

□ Check iimit safety

□ Check temperature rise

D Check primary control
□ Check furnace vent for rust

dcmv

°F net

Cooling

□ Check electrical wiring — connections and insulation (indoor)

G

Check/clean evaporator coil

D Check/clean condensation drain

□ Check static pressure drop ___________ in. w.c. _________

□ Check wiring — connections and insulation (outdoor)

□ Check/clean condenser coil

□ Lubricate condenser fan motor

D Check line set and connections for evidence of leaks

□ Check and record supply voltage

□ Check refrigerant charge

□ Check amperage draw on condenser fan motor

□ Check amperage draw on compressor

Humidifier

□ Check electrical wiring — connections and insulation

□ Check transformer voltage_____________________

□ Check damper position

_cfm (dry coil)

Spray Type

□ Check solenoid valve

□ Check nozzle spray pattern

Drum Type

□ Check for free rotation and scale

□ Check wafer level adjustment

□ Check overflow/drain line

Electronic Air Cleaner

□ Check electrical wiring — connections and insulation

G

Check sail switch or electrical biower interlock

□ Cheekiest button operation

□ Check supply voltage_________________________

□ Check voltage to collecting ptates

□ Check voltage to ionization wires_

GTURN

power

OFF

D Wash cells

□ Wash prefilter screens

_ vac (120 vac)

vdc (3500 vdc)

^ vdc (8000 vdc)

Post-Service Checks

G

Return thermostat to original settings recorded at beginning of service call

G

Leave copy of completed checksheef wHh customer

□ Power ON before leaving

FI 385-895