Installation – Sears KENMORE 1700 User Manual
Page 5
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
installation
(on sheet metal plenums)
riB Install motor bracket on left side. Make sure bracket
is firmly seated (Fig. 6).
w
Install
wire
support
and
nylon
bearing
in
lances. Be sure groove in nylon bearing is toward inside of
humidifier. Bend that portion of the wire support leg ex
tending below the lance, outward, to lock support in lances
(Fig. 7)
.. D
After conversion, unit should look like (Fig. 8).
FIBER PLENUM DUCTS
NOTE:
The mounting screws supplied are for standard in
stallation on sheet metal plenum ducts. If you have fiber
plenum ducts, install the humidifier and components with
thru-bolts, nuts, and washers (not supplied). If necessary,
reinforce the humidifier mounting area on fiber ducts with
sheet metal and provide additional bracing as required to
support the weight of the humidifier and water. (This fiber
duct installation hardware is not supplied and must be pur
chased from your local hardware store.)
1
Mark a level line on selected plenum at bottom lo
cation for humidifier.
NOTE:
Unit must be installed level from left to right and
front to back to maintain proper float control of water.
Hold the humidifier housing against the plenum with the bottom
edge on the level line. Mark location of the (3) holes and large
rectangular opening (Fig. 9).
See Fig. 10 for clearance required to open top cover when re
moving media wheel for servicing. Cut opening with tin snips or
saw and drill (3) 1/8" diameter holes as shown in Fig, 11.
CAUTION:
DO NOT DRILL INTO AIR CONDITIONING COIL.