INSTALLATION
IMPORTANT: Leave these instructions
with the appliance.
OWNER: Keep these instructions for
future use.
TOOL LIST
The following tools are needed to Install your new
counter unit.
• Pipe wrenches
• Flat bladed screwdriver
• Rule or tape measure and straightedge
• Hand saw or saber saw
ADDITIONAL MATERIALS
• Gas supply line shut-off valve
• Pipe joint sealant (resistant to L.P. gas)
CUTOUT AND COUNTER UNIT DIMENSIONS
TABLE 1
Fig. 1
DIMENSIONS
A
30 1/4"
B
21 1/4"
C
28-3/8"
D
19-3/8"
E
19-1/2"
F
28-1/2"
G
14-1/4"
H
3"
J
1-3/4"
K
3-1/4"
LOCATION
See Figures 1 and 2 and Table 1 for all rough-ln and
spacing dimensions. These dimensions must be met
for safe use of your counter unit. See Fig. 3 for recom
mended iocation of gas supply line. Do not Install the
unit near an outside door or where a draft may affect Its
use.
MINIMUM
CLEARANCES
TO
BE
MAINTAINED:
1-3/4" between cutout rear edge and wall behind unit.
3-1/4" between cutout front edge and counter front
edge.
30" between cooktop and nearest overhead surface.
3" on the right and on the left side of the cutout to a
height of 18".
MINIMUM CLEARANCES TO
ADJACENT CONSTRUCTION
IMPORTANT:
Reaching over surface burners can cause fire or burns.
You should not use storage space above the cooktop. If
you choose to use cabinets above the cooktop, install
a range hood that sticks out at least 5" beyond the front
of the cabinets. Cabinets installed above a cooktop may