Fasten the header bracket to the wall, Hardware shown actual size, Fasten the header bracket to the ceiling – Sears 139.53535SRT1 User Manual
Page 14: Installation step 2, Instai! the header bracket, Fasten the header bracket to the, Ceiling
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

installation Step 2
instai! the Header Bracket
You can attach the header bracket either to the
wall above the garage door, or to the ceiling.
Follow the instructions which will work best for
your particular requirements.
Fasten the Header Bracket to the Wall
Center the bracket on the vertical guideline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
• Mark either set of bracket holes (do not use the
holes designated for ceiling mount). Drill 3/16" pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
Header
W al
2x4
Structural
Support
W all
Mounting Holes
Lag Screws
5/16"x9x1-5/8"
The nail hole is for positioning
only. You must use lag screws to
mount the header bracket.
Highest
Point of Travel
(of Garage Door)
Vertical
Center
Line
Optional
W all Mounting
Holes
Hardware Shown Actual Size
J>
Lag Screw
5/16"-9x1-5/8’'
Fasten the Header Bracket to the
Ceiling
• Extend the vertical guideline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" from the wail. Make sure the arrow is
pointing toward the wail. The bracket can be
mounted flush against the ceiling when clearance
is minima!.
• Mark holes designated for ceiling mount only. Drill
3/16" pilot holes and fasten bracket securely to a
structural support with the hardware provided.
Ceiling Mounting Holes
CEILU<ÌG MOÜNtkONLY
//
m
UP
Jrr
U Y...Y
X y
The nail hole is for positioning only.
You must use lag screws to mount
the header bracket.
Finished
Ceiling
14