Installation instructions, Framing diagrams, Figure 1 – Trending Accessibility Multi-Piece (4836, 6033, 6036, 6048, 6060) User Manual
Page 3
![background image](/manuals/714806/3/background.png)
Framing pocket must be sized according to the information provided in the Framing Diagram.
It is recommended that the front studs at each side be doubled for added strength. Framing must be
extremely square and plumb in order to accomplish a successful installation.
2.
It is extremely important that the floor area intended for the installation be flat and level. Any areas over
1/8” out-of-level will prevent the installation from being successful. If an area out more than 1/8” is found,
float the floor area with a floor leveling compound. This material must be placed and cured (dry) before
proceeding with the shower installation.
4.
1.
Prepare the installation area by sweeping the area completely clean
3.
Install hot and cold water supply lines with the control valve. Mount to the framing.
Note: Unit will not install properly if framing pocket is not
square and of proper size. The dimensions shown in the
FRAMING DIAGRAMS are 1/4” larger than the size of the
shower. This product is manufactured to tight specifications.
The 1/4” over sizing is for maneuvering and installation ease.
If 1/4” over is not reasonable, sizing closer to the product
actual dimensions is allowable.
INSTALLATION INSTRUCTIONS
3
FRAMING DIAGRAMS
15 3/8”
Figure 1