Slant/Fin TRDV Series Venting User Manual
Page 9
TRDV SERIES
9
Do not install vent terminals on prevailing wind wall side of structure.
Moisture and ice may form around terminal. Make sure the surface is in good
repair and protected from damage.
Slant/Fin model TRDV boilers can be installed on sealed or direct
vented systems. They must be ordered from the factory with an approved
Direct Vent System. Part numbers for the kits and accessories can be found
on page 8 of this manual.
Typical installation. Note: Vacuum relief valve (VRV) not shown. VRV must be located as shown on page 8.
Vent Terminal
FIELD CONTROLS
FIELD CONTROLS VENT TERMINAL
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- CHS-85 (36 pages)
- CHS-FS-40 (6 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EH-M3 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)