Slant/Fin EH-M3 User Manual
Page 5
EH-M3-40 Boiler Operation and Installation Instructions 5
NOTES:
1.
Optional blocking gate valve and hose end valve used (with drain valve) for fast fill and purge of system.
IMPORTANT
: Close bypass line valve (if used) during purging.
2.
Circulator should not be installed at lowest point of piping.
3.
There should be no elbows, tees, or change of pipe size for at least 5 diameters of pipe size (see Table 2) upstream and downstream of flow switch.
Flow switch should always be mounted in the horizontal position. See Table 2.
Figure 2. Typical SIngle Zone Piping
Figure 3. Typical Multi-Zone Using 2-Way Valves
Figure 4. Typical Multi-Zone Using 3-Way Valves
See also other documents in the category Slant/Fin Equipment:
- Jaguar (36 pages)
- Gas Hot Water (24 pages)
- Oil Hot Water (28 pages)
- Gas Steam (16 pages)
- G-Series (4 pages)
- L-Series (4 pages)
- SC-3 (27 pages)
- SC-9 (32 pages)
- CHS-85 (92 pages)
- CHS-300 (24 pages)
- CHS-85 (36 pages)
- CHS-FS-40 (6 pages)
- EC-20 Installation (16 pages)
- EC-20 Assembly Instructions (20 pages)
- EC-10 Installation (24 pages)
- EC-10 Assembly Instructions (12 pages)
- EC-10DV Series (15 pages)
- EC-10DV Series Venting (8 pages)
- LX-120CB (44 pages)
- LX-90 (44 pages)
- VSL-160C Part B (36 pages)
- VSL-160C Part C (36 pages)
- 3200-Plus (16 pages)
- Gas Conversion Field (20 pages)
- 3000 (8 pages)
- GG-75H (28 pages)
- GXH-230 (20 pages)
- Galaxy Series (4 pages)
- S-150 (28 pages)
- S-34 Vestibule version (28 pages)
- DHWG (8 pages)
- HWT-40 (16 pages)
- EH-M2 (12 pages)
- EM-10 Installation (20 pages)
- EM-10 Service Manual (36 pages)
- EH (6 pages)
- TRDV Series (12 pages)
- TRDV Series Venting (16 pages)
- Intrepid Steam (24 pages)
- J Series (4 pages)
- JA Series (2 pages)
- FS Series (1 page)
- Kicker (2 pages)
- Pak 80 (16 pages)