Post-operating services – Cissell AJ1032 User Manual
Page 13

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Operation
11
AJ1032
NOTE: If either pushbutton is released BEFORE 
pressing pressure is applied, head will return to a 
fully OPEN position.
Pressing pressure will be applied for period of time 
set. When timer times out, head will automatically 
open.
NOTE: Head can be opened at any time during 
timer controlled pressing by pressing OPEN 
pushbutton (Item 5, Figure 2).
6. Hang or fold pressed article as soon as possible to
preserve finish.
Post-Operating Services
Perform the following services after final operation of 
day or anytime press is not going to be used for an 
extended period of time.
1. Close steam supply shut-off valve.
2. Close downstream relieving shut-off valve at air
inlet.
3. Close steam return shut-off valve.
4. Clean press head if required. Refer to
Maintenance section.
