beautypg.com

3 hydraulic plumbing – NORAC UC5-BC-HG01 User Manual

Page 23

background image



20

8.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. The boom raise lines must be connected to the “B” ports on the NORAC block.

3. The boom lower lines must be connected to the “A” ports.