beautypg.com

4 hydraulic plumbing: single acting – NORAC UC5-BC-HD08 User Manual

Page 30

background image



27

9.4 Hydraulic Plumbing: Single Acting

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Install hoses with 90 degree fittings onto the “B” ports on the NORAC valve block.

3. Route the free ends of the hoses to each of the wing tilt cylinders.

4. Remove the Hardi hoses from the tilt cylinders and replace the restricted BSPP fittings from

the butt ends of the cylinders with straight through 1/4 x 3/8 BSP fittings (Figure 28).

5. Install a 1/4 inch BSP tee union onto the fitting on the cylinder and install the NORAC and

Hardi hoses onto the tee union.

Figure 28: Restrictor to be Replaced on the Tilt Cylinders

6. At the Hardi main valve block, remove the hydraulic hoses that run from the butt end of

the tilt cylinders to the valve block.

7. Install a 1/4 x 1/4 1.8 restrictor between the hoses and the valve block.

8. Remove the pressure and tank hoses from the Hardi valve block and install a 1/4 inch BSP

tee union between the valve block and hoses.

9. Connect hoses to each of the tee fittings and route to the NORAC valve block.

10. Install the corresponding hose to the pressure and tank port on the NORAC valve block.

Eagle Boom

Force Boom

Replace this

Restrictor