10.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Insert the 6FJXR-6MJT tee fittings (F02) between the Fast valve block and the existing

“raise” lines.

3. Connect hoses H02 to the free end of the fittings F02 and route to the NORAC block.

4. Connect hoses H02 to the “B” ports on the NORAC valve block.

5. The “raise” lines must be connected to the “B” ports of the NORAC valve block.

6. Insert the 8FJXR-8MJT tee fittings (F03) between the Fast valve block and the existing tank

(“T”) and pressure (“P”) lines.

7. Connect hoses H01 to the free end of the fittings F03 and route to the NORAC block.

8. Connect hoses H01 to the pressure (“P”) and tank (“T”) ports on the NORAC valve block.

9. Ensure there are no other orifices present in the circuit between the NORAC valve block

and the boom cylinders.