10 hydraulic installation, 1 valve assembly – NORAC UC5-BC-CS05 User Manual
Page 27
24
10 Hydraulic Installation
Ensure all pressure has been bled from the system before disconnecting any lines
or fittings. Hydraulic pressure will exist on the wing tilt circuits unless the wings
are being supported by other means. The hydraulic installation may be performed
with the wings in transport position, resting on the ground or with the tilt cylinders
fully extended.
Component failure due to oil contamination is not covered under the NORAC UC5
system warranty. It is recommended that a qualified technician perform the
hydraulic installation.
10.1 Valve Assembly
1. On a clean surface remove the plastic plugs from the block.
2. Install the 6MB-6MJ (F02) fittings into the “P” and “T” ports. Tighten to 18 ft-lbs (24 Nm).
3. Insert the two orifices (F09) into the “B” ports with the notch facing outward.
4. Install the 6MB-6MOR (F05) fittings into the “B” ports. Tighten to 18 ft-lbs (24 Nm).
5. Insert the two orifices (F09) into the “A” ports with the notch facing inward.
6. Install the 6MB-6MOR (F05) fittings into the “A” ports. Tighten to 18 ft-lbs (24 Nm).
Figure 27: NORAC Valve Block Details
7. Install the 6MB 6MOR fittings (*F04) into the “A” and “B” ports of the 3
rd
station.