beautypg.com

5 electrical installation – NORAC UC4+BC+HG3 User Manual

Page 19

background image

16

4.5 E

LECTRICAL

I

NSTALLATION

1. Install the UC4+ Control Panel (E01) in

the cab of the sprayer. Mount the panel
where it will be clearly visible and within
easy reach of the operator.

In the Hagie cab, a good spot to

mount the UC4+ control panel is
on the right hand side of the cab,
next to the spray controller

Figure 21: Control Panel Mounting

If mounting the panel to a round

pole, use the rail mount adapter
kit (B06) (Figure 22).

Figure 22: Mounting the Control

Panel Using the Adapter Kit (B06)

2. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 23: Valve Cable Connections

3. Connect cable C02B to the free AMP

connector at the center of the sprayer
on the Hagie wiring.

4. Connect cable C06 to one of the free

ends of cable C02B and route it to the
chassis roll sensor, which is mounted
near the cab.

5. Connect one of the remaining AMP

connectors on cable C02B to the main
lift sensor and the final AMP connector
must connect to the boom frame roll
sensor.

6. Cable-tie installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

ROP