beautypg.com

NORAC UC4+BC+RB1 User Manual

Page 23

background image

20

Figure 24: Valve Cable Connections

13. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C11 (Figure
25
).

14. Route the CAN Node cable (C02B) to

the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.

15. Connect 4-pin AMP connectors on

C02B to the sensors.

16. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B
(Figure 25).

17. Route the sensor branch cable (C02) to

the wing and main sensors and connect
to the sensors. Follow existing cables

and/or hydraulic lines along the boom.

18. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.

Figure 25: Cable Configurations: C11,

C02and C02B