beautypg.com

NORAC UC4+BC+RB1 User Manual

Page 22

background image

19

Ensure the UC4 Control Panel’s

power is OFF for the remaining
installation (Bottom of switch

pressed IN). Use caution when
handling the +12 V power line of
the REDBALL wiring.

4. Route the free end (R16) of C10 out

of the cab, to the vicinity of the tractor
hitch.

5. Connect the 16-pin AMP plug (P16) of

the extension cable (C10) to the free
end (R16) of C11 located at the hitch
(Figure 22). This connection will
provide your hitch disconnect. Route
the cable accordingly.

6. Route C11 to the rear of the sprayer,

in the vicinity of the valve block.

Figure 23: Cable Configurations: C11, C13, C12, and C03

7. Connect the 3-pin Shroud (S3) on the

wing interface cable (C13) to the
mating 3-pin Tower (T3) on C11
(Figure 23).

8. Route the free end of C13 to the

existing valve block and insert all of the
Weather Pack tees between the
matching valve connections. For each
tee, the function is labeled on the
branch wire.

9. Connect the 6-pin Shroud (S6) on the

main interface cable (C12) to the
mating 6-pin Tower (T6A) on C11.

10. Route the free end of C12 to the

vicinity of the existing valve block and
insert the Weather Pack tees between

the matching valve connections. For

each tee, the function is labeled on the

branch wire.

11. Connect the 6-pin Tower on the valve

cable (C03) to the mating 6-pin Shroud
(S6A) on C11.

12. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.